![]() | Contents
Introduction
General information
Before starting
General description and technical characteristics
Purpose and scope
Combine equipment
Design features
Additional equipment
Rating plate and serial number
Brief information about the device of the combine
Direct combining technological process
Technological process of picking up swaths by the pick-up platform
Basic technical data
Security requirements
Plates (applications) with warning and prohibition signs and notices
Safety instructions
Intended use
General safety instructions
Safety rules for unloading from a railway platform
Safety requirements when driving
Safety precautions when making adjustments or repairs under the header or pickup
Fire safety rules
Controls and devices
Workplace
Steering column
Control panel
Emergency stop algorithm
Fuel feed control (combine with YAMZ, Cummins 6STA8,3 engine)
Fuel supply control (harvester with Cummins QSC8,3-260 engines)
Combine motion control
Range box control
Control panel PU-142-01
Dashboard
Purpose and work
List and designation of pictograms
Getting started PI
UI setup
PUM-02 reel rotation control panel
Brake control
Launcher
Lighting and signaling devices
Microclimate devices
Electro-hydraulic control of combine mechanisms and adapters
Reassembly, commissioning and running-in on-site
General provisions
Harvester reassembly
General assembly instructions
Installing dismantled engine parts
Installation of hydraulic equipment
Reassembling the feeder house when mounting the header
Assembling the loader
Chopper trailer assembly
Installation of electrical equipment
Installing fire extinguishers
Brake performance test
Re-equipment of the feeder harvester chamber when attaching a device for harvesting corn for grain
Running in
Basic work before running in
Dry running (no load for 2.5 hours)
Running-in (within 60 hours)
Rules of operation and regulation
Transportation and towing rules
Transportation of harvesters by rail
Transporting the combine to the farm
Moving the combine with the reaping part
Preparing the shredder-spreader
Preparation of IRS for work according to scheme No. 1 (crushing and scattering of the non-grain part of the crop)
Preparation of IRS for work according to the scheme No. 2 (laying uncut straw in a swath)
General instructions for using the combine
Working order of the header
How the pick-up platform works
Thresher operation
General instructions for preparing the thresher for work
Installation of the threshing unit gap adjustment mechanism
Drum variator belt tension adjustment
Cleaning fan speed control
Blinds opening adjustment
Feeder house drive on / off adjustment
Features of the assembly of the straw walker
Threshing device repair
Hopper and unloading device
Conveying devices
The principle of operation and adjustment of the Lenix of turning on and off the main counter drive
The principle of operation and adjustment of the Lenix counter-drive of unloading
The principle of operation and adjustment of the unloading auger tension reducer
The principle of operation and adjustment of the Lenix counter drive of the chopper
Workplace operation
Hydraulic equipment operation
Steering hydraulic system
Positive displacement hydraulic system and hydrostatic transmission
Refueling the GHA
Change of oil and filter elements on the combine
Replacing hydraulic oil on combine
List of filter and filter elements
Operating the motor unit
Motor installation with the YaMZ-236BK-3 engine
Motor installation with the Cummins engine - 6STA8,3
Motor unit with "Cummins - QSC8,3-260" engine
Running undercarriage
Steering axle
Features of the brake system operation
Features of dismantling bridges
Bearing support operation
Maintenance
General information
List and recommended order of performance of work for each type of maintenance
Maintenance during transportation by its own power
Shift maintenance (EMC)
First maintenance (TO-1)
Second maintenance (TO-2)
Preparing the combine for long-term storage
Removal maintenance
Technical requirements for the main assembly units and systems of the combine
Combine lubrication
Automatic centralized lubrication system
Storage rules
General instructions
Preparing the combine for storage
Storage of the combine and its components
Tire storage
Storing the pick-up box
Hydraulic equipment storage
Removal from storage
Possible malfunctions and methods of their elimination
Applications
Appendix A List of spare parts, tools and accessories
Appendix A1 List of quick wear parts not covered by the warranty
Appendix B1 Hydraulic schematic diagram (GST f. "Danfoss")
Appendix B2 Hydraulic schematic diagram (GST f. "Linde")
Appendix B Electrical schematic diagram
Appendix D Belt and chain drives
Appendix E1 Recommended operating modes of the thresher under optimal harvesting conditions
Appendix D2 Recommended working speed of the harvester for direct combining, km / h
Appendix E Operation of bearing arrangements
Appendix G Volumes of refueling tanks and recommended brands of fuels and lubricants |